This is a period property constructed on the turn of the last century having been converted to provide eight units, located on the first, second and third floors with a loft conversion. The residential conversion was only partly completed by the previous contractor, so the challenge was to estimate what the remaining works to complete the M&E and Building Works.
We instructed Richard Abbott from Pope Building Services Consulting Engineers to provide a detailed report of the outstanding services installation.
A Schedule of Works for outstanding Mechanical Engineering and Building Works was provided and put out to tender.
![Incomplete Services Installation](https://images.squarespace-cdn.com/content/v1/6440e9371555261d33c8b668/94868af4-1581-4d92-bac0-0343b173b91c/Goldhawk1.jpg)
Incomplete Services Installation
![Incomplete Building Works](https://images.squarespace-cdn.com/content/v1/6440e9371555261d33c8b668/c45e2a30-cc93-4a38-bbc8-95fa7964eea1/Goldhawk2.jpg)
Incomplete Building Works
![New Kitchen pending completion](https://images.squarespace-cdn.com/content/v1/6440e9371555261d33c8b668/bb6c8769-a8f9-40ea-aba1-6a573ce75ad2/Goldhawk3.jpg)
New Kitchen pending completion
![New Bathroom pending completion](https://images.squarespace-cdn.com/content/v1/6440e9371555261d33c8b668/4ad2610e-8b16-411c-aaff-8fcbf38e5c2d/Goldhawk4.jpg)
New Bathroom pending completion
The project has now been successfully completed and the units are offered to owners and tenants by Frost Meadowcroft.